Kärcher contributes to the preservation of the "Symbol of Remembrance" memorial in Stuttgart
Kärcher conducted cleaning works at the "Zeichen der Erinnerung" (Symbol of Remembrance) memorial at Stuttgart's "Nordbahnhof" (north railway station) in a restorative way.
Biogenic growth was removed from the 70-metre-long memorial by means of particularly gentle cleaning in steam mode and with extremely low surface pressure.
Two hot water high-pressure cleaners of the type HDS 17/20 De Tr and HDS 13/20-4 S were used to remove the soiling.
The "Zeichen der Erinnerung" (Symbol of Remembrance) was designed in 2006, based on the plans of the married couple Anne-Christin and Ole Saß, and serves both as a memorial and a monument.
Gentle cleaning
Kärcher cleaned the "Zeichen der Erinnerung" (Symbol of Remembrance) memorial at Stuttgart's "Nordbahnhof" (north railway station) in a restorative way. In doing so, Kärcher wanted to make a contribution to maintaining and preserving the place of remembrance.
As part of the cleaning project, biogenic growth was removed from the 70-metre-long memorial by means of particularly gentle cleaning in steam mode and with extremely low surface pressure. Within the context of restoration, the Kärcher cleaning experts were using two hot water high-pressure cleaners of the type HDS 17/20 De Tr and HDS 13/20-4 S to remove the soiling. The base areas were cleaned with hot water and reduced pressure; the steam mode of the HDS 13/20 was used for the vertically-exposed concrete surfaces.
"Zeichen der Erinnerung" (Symbol of Remembrance) Memorial
Between the winter of 1941 and the spring of 1945, nearly 3,000 Jews, Sinti and Romani people were deported to concentration camps in Auschwitz and Theresienstadt, among others, from what is today the location of the memorial. The "Zeichen der Erinnerung" (Symbol of Remembrance) was designed in 2006, based on the plans of the married couple Anne-Christin and Ole Saß, and serves both as a memorial and a monument. Since then, it has been a reminder of the history of this site, which, following the station's closure, all but vanished from public awareness.
Facts at a glance
Country:Germany
City:Stuttgart
Soiling:Biogenic growth
Cleaning Technology:热水高压HDS类型1的清洁工7/20 De Tr and HDS 13/20-4 S, gentle cleaning in steam mode and with extremely low surface pressure
Execution:March 2019